|
1-888-FARMGRID 1-804-262-7698
|
|
In all applications, the rock base depth, material and how well it is packed is a determining factor of drainage and LBC. Stalls/Run In Sheds Rock Base of at least 2-6" Smaller porous base of 1-2" *optional if rock base is difficult to level Install grid and make cuts if needed Inspect grid to make sure all connections are secure and grid is seated properly Fill Grid with a fine grained, sharp porous material Tamp/Water/Pack Bedding
Gate/Water Tub/Paddock Rock Base of 2-6" (or more if desired) Smaller porous base of 1-2" may be used if rock base is hard to level Layer of soil for nutrients if grass is being planted of 2-6" Install grid and make any trims necessary Inspect grid installation to ensure that all connectors are fastened securely and make sure grid is seated properly on base Make sure all edges are backfilled Fill Grid with a sandy/loamy soil and plant seed Pack/Tamp/Water Keep area watered regularly until filled in
Grass Driveway Rock Base of 4-20" deep depending on use Layer of soil for nutrients of 2-6" Install Grid Inspect grid to make sure that all connectors are secure and make sure the grid is seated securely on base Make sure all edges are backfilled Fill Grid with a sandy/loamy soil and plant seed Tamp/Pack/Water Water regularly
|
|
Send mail to
info@stable-grid.com with
questions or comments about this web site.
|